1.Surface
The surface has to be clean and flat.
2.Adhesive
Sand and cement on a 4/1 or 5/1 ratio.
3. Tiling
Put the stone in place with a rubber mallet, use mortar as grout in the he joints and clean thoroughly with water and a brush.
TILES
1. Surface
The surface has to be clean and flat.
2.Adhesive
Latex-cement mortar, used on both the wall and the tiles.
3. Tiling
Put the stone in place with a rubber mallet and leave a joint of 2 or 3 mm. It is very important to clean everything thoroughly after finishing the work.
Treatment |